THERMON PETK
Công Nghệ Phụ kiện

THERMON PETK (PETK-1 for BSX, RSX, VSX-HT)

THERMON PETK

PETK-1 for BSX, RSX, VSX-HT
 PETK-2 for KSX, HTSX, USX
 PETK-3 for HPT, FP
 PETK-3-ECM for HPT, FP

PETK

The following installation procedures are
guidelines for the installation of the Power and End
Termination Kit. For translations other than English
and local language translation provided here, please
contact Thermon. The English language installation
procedure shall govern.

Receiving, Storing and Handling

  1. Inspect materials for damage incurred during
    shipping.
  2. Report damages to the carrier for settlement.
  3. Identify parts against the packing list to ensure
    the proper type and quantity has been received.
  4. Store in a dry location.

Installation Precautions
• To minimize the potential for arcing and
fire caused by product damage or improper
installation use ground-fault protection. The
National Electrical Code (NEC) and Canadian
Electrical Code (CEC) require ground-fault
protection of equipment for each branch circuit
supplying electric heat tracing.
• Installation must comply with Thermon
requirements and be installed in accordance with
the NEC, CEC, or any other applicable national and
local codes.
• Component approvals and performance ratings
are based on the use of Thermon specified parts
only.
• De-energize all power sources before opening
enclosure.
• Keep ends of heating cable and kit components
dry before and during installation.
• Individuals installing these products are
responsible for complying with all applicable safety
and health guidelines. Proper Personal Protective
Equipment (PPE) should be utilized during
installation. Contact Thermon if you have any
additional questions

INSTALLATION PROCEDURES

Công ty TNHH Wili

Web: Wili.com.vn

Mail: Jan.tran@wili.com.vn

Liện hệ: 0356 975 994 ( Jan Tran)

Liên quan...

Chủ đề phổ biến

Để lại một bình luận

Email của bạn sẽ không được hiển thị công khai. Các trường bắt buộc được đánh dấu *